Category: Oil and Gas
-
Feasibility Study for Treatment of Produced Water, Oil and Gas Client, Orange County, California
The site is an active oil and natural gas production property that currently re-injects approximately 135,000 barrels per day (BPD) of produced water. As a result of limited reinjection capacity, the facility was required to treat and discharge up to 30,000 BPD of produced water to the sewer system. Produced water required treatment to comply…